2004 - Oil

The site had recently become a COMAH establishment. This created the requirement for a formal permit-to-work system. Being a very small and simple operation, the client did not have the resources to develop, operate or maintain a complex system. Andy was asked to develop a system that was compliant with relevant regulations and guidance, but practical for the operations taking place and staffing levels present on the site. Andy developed a two-part permit-to-work system. The first part was used during the planning stage of a job to analyse the potential risks and specify the necessary controls. The second was used to control the work on the days it was being carried out. The client felt this was a very practical solution.