2010 - Gas

The site had been in operation for many years and studies had shown that replacement of a number of major items of equipment would be required if it was going to achieve future safety, environmental and commercial requirements.  Andy was engaged to act as the human factors engineer within the design team.  His  role included identifying the aspects of the project that would have the greatest potential impact on human factors, to assist the design team in addressing the requirements and to review the design to ensure human factors requirements had been achieved.  A key element of the project was the adoption of a new control system, which included a new control room. Although this work was carried out at a very early stage in the project, Andy was able to influence the design in a number of areas, including the location of the control room and its basic layout; and he developed a detailed list of actions to be completed as the project progressed.