2009 - Gas storage

Andy was commissioned as the human factors expert during front end engineering for a new gas storage facility. His task was to ensure human factors was given sufficient consideration during the early stages of design, to develop plans for implementation during detailed design and to support the pre-construction safety report required under the COMAH regulations. He did this by developing a human factors integration plan that was consistent with industry good practice and the overall project. It was accepted by the client, regulator and engineering team as a useful method of making sure human factors received sufficient attention throughout the project.