2003 - Liquefied Natural Gas (LNG)

The client was the design contractor for a large Liquefied Natural Gas (LNG) facility to be located in Northern Norway. As part of the contract the client was required to provide an 'emergency preparedness report' that defined equipment and procedural requirements, that was to be used by the Operator to develop emergency systems for the facility. Andy developed the emergency preparedness report for the client. This involved reviewing the Operator's specifications and the plant design and risk assessments. Andy advised the client on the minimum requirements, and practical considerations given likely manning levels and environmental conditions (note the facility was to be operated in northern Norway). He attended meetings with the client and Operator to confirm the necessary arrangements.

The client was planning to change from a 8-hour to 12-hour shift pattern. The main driver for this was that they were having problems arranging cover for holidays, sickness etc. This had resulted in frequent working of double shifts (i.e. 16 hours). Andy made extensive use of fatigue research documented in HSE Contract Research Report 254/1999, and the working time directive and UK regulations. Communication was key element in this project and research about shift handover described in HSE offshore report OTO 96003 was used.