2006 - Gas terminal

Andy was seconded to the pre-operations team during the final design and construction phases of a new gas terminal. Andy's role was to facilitate task analysis and risk assessment, and to use the results to specify plant and interface design, procedural and competence requirements. This was a significant contribution to the preparation of the COMAH safety report and development of safe systems of work. Andy has provided ongoing support to the project, and this has demonstrated that human factors best practices can be incorporated into a project with minimal extra time and cost over 'traditional' approaches.