2007 - Liquefied natural gas (LNG)

The client was building a new facility, which was to include a new control room. Andy was asked to comment on the engineering contractor's design. He identified a number of deficiencies and was able to advise on how current good practices could be incorporated. He was subsequently asked to provide more detailed advice on the operator interfaces in the control room.

Andy conducted a task analysis workshop with the future operators of the plant. From this he was able to specify requirements for overview and detailed graphics; including task and scenario based displays where appropriate. As well as using the analyses carried out by Andy in the design of their user interfaces, the operators continued to carry out additional task analyses using the same method as they found it a very valuable exercise in reviewing the plant design and considering how they were to operate the plant in the future.