2009 - Gas onshore processing

Andy was required to visit newly constructed buildings housing electrical and control equipment.  His brief was to ensure the arrangements were appropriate to minimise risk of human error.  Andy identified that a number of cabinets were not positioned in a logical order, and that some labelling was confusing and ambiguous.  He was able to make practical and cost effective recommendations that were accepted by the engineering team as worthwhile and achievable.