2007 - Gas onshore processing

Having completed 60% of the design for a major new plant, a review of the three dimensional model of the plant was carried out. This was attended by representatives of the design contractor, construction contractor, client and future operator.

Andy's role was to provide specialist human factors engineering input, advising on potential conflicts between the proposed plant layout and human factors good practice; and suggesting feasible solutions. Shell's Design and Engineering Practice (DEP) on human factors engineering was used throughout this project, and in fact this was one of the first major projects where this had been the case.