2006 - Liquified Natural Gas (LNG)

The site had recently undergone extensive modification. This included addition of a new control console in the existing control room. The client recognised that the design of the console had not received sufficient attention, and that the physical ergonomics were not ideal. Andy was asked to evaluate whether process safety had also been compromised through the design. The conclusion was that current best practice had not been followed, and that this meant risks were not as low as reasonably practicable. Andy then used the results of this study to influence the design of a new control room, to be constructed in approximately two years time. He was able to get the principles of ISO 11064 incorporated into the project, including end user participation.